Highbury Avenue – Venigee Expressway Bridge Renovation


Town is rehabilitating the Venige Expressway Bridge by changing the getting old infrastructure. There may even be obligatory highway and culvert enhancements at Highbury Avenue South from the Venice Expressway Bridge to Freeway 401, designed for future building.

The challenge may even embrace proactive transportation enhancements by offering future connections to close by neighborhood walkways and trails.

The Highbury Avenue – Venigee Expressway Bridge renovation challenge is certainly one of London’s high 10 building tasks this yr acknowledged within the Metropolis’s Renewal London building programme.

place

picture

The map above reveals the extent of the Part 1 building challenge.

Work

Town accomplished the next on the primary section of the challenge in 2020:

  • Repairs to the lanes main south of the present bridge and from Energy Avenue to the south of the River Thames on Highbury Avenue South
  • Concrete repairs on the abutments (helps) of the bridge
  • Superior road lighting within the space

Town will full the next works in 2021:

  • Highway restore in northbound lanes from Energy Avenue to the south of the River Thames
  • Creating an Lively Transport Connection Close by paths and trails
  • Changing from North to Central of the Bridge to Hamilton Highway
  • road gentle improve

In Part 2, the town is planning the next actions:

  • Reconstruction of Highbury Avenue from the Venigee Expressway Bridge to Freeway 401, together with culvert work wanted to switch getting old infrastructure
  • road gentle improve

the acquire

  • Bettering the well being of the River Thames by decreasing runoff from the Venigee Expressway Bridge
  • enhanced pedestrian expertise
  • elevated connectivity between communities
  • Prolonged Life Expectancy of the Venigee Expressway Bridge

Contact

Trevor Hitchon, CET

Technologist II

Thichon@london.ca

519-661-2489 x 5925



Supply hyperlink